Case Studies

Olympic Athletes Village

Residential Athletes Village

In the build-up to the hugely successful 2012 Olympic Games in London, massive regeneration schemes were undertaken within Stratford to provide not only facilities for the immediate games.

Read More

Cardiff University

IKM successfully deploy internet capability to Halls of Residence buildings at Cardiff University

Cardiff University recognised that in order to offer their student’s access to high speed internet for both their research and email communication, they would have to provide an internet connection to each of the student rooms.

Read More
"As a result, we have engaged with IKM for a considerable number of other projects on our campus".

Major Airport

Infrastructure & Cabling Subcontractor for major airport terminal

IKM commenced the infrastructure deployment of the satellite building in 2004, this involved the installation of backbone copper and fibre, interconnecting 14 separate Comms Room each with diverse routing as well as 12 Aircraft stands.

Read More

Wandsworth 6A

High rise Multi Dwelling Units (MDU) in and around the capital

With the increasing demand for new homes in the UK, and with available land being at a premium, the demand to build High rise Multi Dwelling Units (MDU) in and around the capital has amplified.

Read More

IKM has provided cabling services to Computacenter at Heathrow Airport since October 2012. The IT services and solutions provider provides a 25-strong onsite team, which has worked on more than 300 projects, and installed more than 110 kilometres of cabling.

IKM’s flexible approach and scalability means Computacenter can action cabling moves and changes quickly to meet evolving business needs, while complying with stringent health and safety regulations required of an airport environment.

Neal Bates, Computacenter (UK) Ltd

Contact Us
Logo Contact Us